Hawaiʻi BEAD Explorer

Subgrantee selection

How Hawaiʻi chose who builds: fixed project areas, a public rubric, a formula that rewards the lowest ask, and the outcome.

Headline figures

Project areas
4
Receipt
“The State of Hawaiʻi defined four project areas covering the entire state for subgrantee selection: County of Kauaʻi, City and County of Honolulu, County of Maui (inclusive of Kalawao), and County of Hawaiʻi.”
Final Proposal, p.7
RFPs in the July 2025 round
8
Receipt
“UHBO released eight new RFPs in July 2025, as part of the final “Benefit of the Bargain” Round mandated by the new federal guidance.”
Final Proposal, p.7
Proposals per project area, unserved and underserved RFPs
4
Receipt
“UHBO received four proposals for each project area for all unserved and underserved RFPs.”
Final Proposal, p.30
Points available, unserved and underserved RFPs
245
Receipt
“Total Points: 245”
Final Proposal, p.25
Points available, CAI RFPs
240
Receipt
“Total Points: 240”
Final Proposal, p.28
Funded locations
7,033
Receipt
“Locations: 7,033”
NTIA Final Proposal Overview, p.1
Preliminary awards
Hawaiian Telcom (fiber) · Amazon Leo (LEO satellite)
Receipt
“The University of Hawaiʻi Broadband Office (UHBO) made preliminary awards to two telecommunications companies, Hawaiian Telcom and Amazon Leo, a low-earth orbit satellite provider, following a competitive RFP process.”
Lt. Governor release, Dec 23 2025, p.1

Timeline

RFP issued
July 11, 2025
Receipt
“Date of Notice (RFP Issued) July 11, 2025”
Final Proposal, p.8
Proposals due
August 1, 2025
Receipt
“Closing Date for Receipt of Proposals August 1, 2025 (5pm HST)”
Final Proposal, p.8
Proposal review
August 2 to 4, 2025
Receipt
“Proposal Review Period August 2 - 4, 2025”
Final Proposal, p.8
Preliminary award
August 5, 2025
Receipt
“Date of Contractor Selection and Preliminary Award August 5, 2025”
Final Proposal, p.8
Final Proposal approved by NTIA
November 18, 2025
Receipt
“Hawaiʻi received NTIA approval of its Final Proposal on November 18, 2025.”
UHBO Final Proposal page, p.1

How points were awarded

Scoring criteria, unserved and underserved RFPs

Scoring criteria, unserved and underserved RFPs
Minimal BEAD Program Outlay (primary)200
Speed to Deployment (secondary)30
Speed of Network and Other Technical Capabilities (secondary)15

Rows sum to 245, the stated total.

Receipts (3)
  • Minimal BEAD Program Outlay (primary)
    “Minimal BEAD Program Outlay 200”
    Final Proposal, p.25
  • Speed to Deployment (secondary)
    “Speed to Deployment 30”
    Final Proposal, p.25
  • Speed of Network and Other Technical Capabilities (secondary)
    “Speed of Network and Other Technical Capabilities 15”
    Final Proposal, p.25

Scoring criteria, CAI RFPs

Scoring criteria, CAI RFPs
Minimal BEAD Program Outlay (primary)200
Speed to Deployment (secondary)30
Speed of Network and Other Technical Capabilities (secondary)10

Rows sum to 240, the stated total.

Receipts (3)
  • Minimal BEAD Program Outlay (primary)
    “Minimal BEAD Program Outlay 200”
    Final Proposal, p.28
  • Speed to Deployment (secondary)
    “Speed to Deployment 30”
    Final Proposal, p.28
  • Speed of Network and Other Technical Capabilities (secondary)
    “Speed of Network and Other Technical Capabilities 10”
    Final Proposal, p.28

Speed of Network and Other Technical Capabilities, unserved and underserved RFPs

Speed of Network and Other Technical Capabilities, unserved and underserved RFPs
Max speed and latency5
Longevity (useful life)5
Cost-effectiveness of future scalability5

Rows sum to 15.

Receipts (3)
  • Max speed and latency
    “Max speed and latency for unserved and underserved locations: Maximum score - 5 points”
    Final Proposal, p.27
  • Longevity (useful life)
    “Longevity: Maximum score - 5 points”
    Final Proposal, p.27
  • Cost-effectiveness of future scalability
    “Cost-effectiveness of Future Scalability: Maximum score - 5 points”
    Final Proposal, p.27

Run the published formula

Computed here from the formulas on Final Proposal pages 25 to 26, starting from the document's own examples. These are illustrations of the rubric, not figures about Hawaiʻi's actual bids, which are not public.

Scoring calculator
OfferorRequested ($M)Cost per BSL ($k)MonthsPart 1
Formula
“The points allocated to bidders with larger amounts will be equal to the lowest amount, multiplied by the maximum points for Part 1, and then divided by the larger amount.”
Final Proposal, p.25
Part 2
Formula
“The points allocated to bidders with lower amounts of cost per location will be equal to the lower amount, multiplied by the maximum points for Part 2, and then divided by the largest amount.”
Final Proposal, p.26
Outlay
Formula
“Offeror A: 100 + 50 = 150 Points”
Final Proposal, p.26
Speed
Formula
“forty-eight (48) minus the Offeror’s proposed number of months to complete the deployment, then divided by forty-eight (48), then multiplied by the maximum number of points.”
Final Proposal, p.26
Offeror A100501507.5
Offeror B8010018011.25
Offeror C57.166.7123.815

Not computed: the 15 percent rule that decides whether secondary criteria apply, and the technical sub-scores, which the review committee judged.

Worked examples (12)

Outcome

Funded locations by technology, approved Final Proposal

Funded locations by technology, approved Final Proposal
Fiber-to-the-premises5,748
Low Earth Orbit satellite1,285

Rows sum to 7,033, the stated total.

Receipts (2)

How the process was run

Formulas and rules

Formulas and rules from the Final Proposal
RuleTextSource
Part 1: requested BEAD funding
“The prospective subgrantee that requests the LOWEST amount of requested BEAD funding will receive the maximum score.”
Final Proposal, p.25
Part 1 formula
“The points allocated to bidders with larger amounts will be equal to the lowest amount, multiplied by the maximum points for Part 1, and then divided by the larger amount.”
Final Proposal, p.25
Part 2: cost per location
“The prospective subgrantee that offers the LOWEST amount of BEAD funding per broadband serviceable location (BSL) in the project area will receive the maximum score.”
Final Proposal, p.26
Part 2 formula
“The points allocated to bidders with lower amounts of cost per location will be equal to the lower amount, multiplied by the maximum points for Part 2, and then divided by the largest amount.”
Final Proposal, p.26
15 percent rule
“If proposals had project costs within 15 percent of the lowest cost proposal, the secondary criteria were used for all proposals.”
Final Proposal, p.26
Speed to Deployment formula
“forty-eight (48) minus the Offeror’s proposed number of months to complete the deployment, then divided by forty-eight (48), then multiplied by the maximum number of points.”
Final Proposal, p.26
Max speed and latency tiers
“100 Mbps download / 20 Mbps upload & less than 100ms 1 points 100 Mbps download / 50+ Mbps upload & less than 100ms 2 points 250 Mbps download / 50+ Mbps upload & less than 100ms 3 points 500 Mbps download / 100+ Mbps upload & less than 100ms 4 points 1000 Mbps download / 500+ Mbps upload & less than 100ms 5 points”
Final Proposal, p.27
Longevity
“Life spans of 15 years or greater will receive the maximum number of points; life spans shorter than 15 years will receive a prorated amount.”
Final Proposal, p.27
Scalability
“Proposals that are very effective will receive the maximum score of 5 points. Proposals that are less effective will receive fewer points.”
Final Proposal, p.27
CAI difference
“A similar approach was taken for the CAI RFP process, with the exception of removing the “max speed and latency” points for the Speed of Network and Other Technical Capabilities criteria, as the speed requirements were a minimum of 1 Gbps symmetrical.”
Final Proposal, p.27